Roadway Improvements

Roadway Improvements

Greenspot Road Street and Storm Drain Improvement from Highway 210 to Boulder Ave

LOCATIONCity of Highland, California

PROJECT SCOPE: Installation of new decorative street light poles, median landscape lighting, traffic signals, and dry utilities.

CHARACTERISTICS: This project involves the removal of asphalt and concrete pavement, concrete curb, and sidewalks; construction of new storm drain improvements including reinforced concrete pipe, construction of catch basins, curb and gutters, sidewalks, raised medians, decorative pavement, installation of decorative street lights, utility services, landscaping and irrigation, rubberized asphalt overlay paving and pavement striping and signage and markings located within the City of Highland.

Greenspot Road Street and Storm Drain Improvement from Highway 210 to Boulder Ave

Bike Network Linkages to Exposition Light Rail

LOCATIONSanta Monica, California

CUSTOMERCity of Santa Monica

PROJECT SCOPE: Improve protected bike lanes throughout the city.

CHARACTERISTICSInstalled video detection systems at 20 intersections, 1241 bike racks, 530,000 square feet of solid green paint bike lane and 747 white paint bike symbol and arrow.

START AND FINISH DATE: September 2018 to March 2020

Bike Network Linkages to Exposition Light Rail

Los Trancos Service Road

LOCATION: Irvine, California

CUSTOMERUniversity of California, Irvine

PROJECT SCOPE: Construct pedestrian crosswalks with rectangular rapid flashing beacons, roadway and striping enhancements for pedestrian safety improvements.

CHARACTERISTICS: Installed 5 wireless reflective rapid flashing beacons, decorative artwork crosswalks, concrete and asphalt work.

START AND FINISH DATE: October 2019 to April 2020

Los Trancos Service Road

Los Trancos Service Road

LOCATIONIrvine, California

CUSTOMERUniversity of California, Irvine

PROJECT SCOPE: The scope of work involves removing existing AC pavement, concrete, landscaping, and electrical conduit. It also includes relocating existing irrigation and signage, as well as constructing a new roadway, sidewalks, bollards, and curb ramps.

CHARACTERISTICS: Installed a new access control gate at the Los Trancos service road to mitigate traffic congestion and provide a clearer access for fire trucks.

START AND FINISH DATE: March 2018 to July 2018

Los Trancos Service Road